Strath Haven High School Renovations: Frequently Asked Questions
Date: October 16, 2026
As part of the Strath Haven High School renovation project, the Wallingford-Swarthmore School District is exploring updates to several student restroom areas and universal individual toilet rooms. The proposed design is intended to provide greater student privacy, improve supervision of shared spaces, address safety concerns, and create a more welcoming environment that meets the needs of all students.
These proposed improvements are part of the district's larger effort to update aging facilities and provide a warm, safe, and dry environment.
The project is currently in the design development phase, following the Board of School Directors' approval of the schematic design in September 2026. The plans presented to date represent preliminary concepts, and specific design features may be refined or adjusted as planning continues.
What Would the Renovated Toilet Rooms Look Like?
Under the current schematic design, each renovated area would include several private, single-occupancy toilet rooms with floor-to-ceiling walls and doors. The proposed design also calls for features intended to limit sound between individual rooms.
The district is also considering how restroom facilities can better accommodate the diverse needs of students. By providing individual, private toilet rooms that would be available to all students, the proposed design aims to create a more welcoming environment while respecting individual privacy.
Each toilet room would be intended for use by one student at a time. The current plans show sinks located in a shared area outside the individual rooms, with the possibility of including sinks in some of the individual rooms as well.
The district’s schematic design presentation includes a visual of the proposed layout on the slide titled “Proposed Toilet Room Renovations.”
These layouts are preliminary and may change as the design is further developed.
Why Are These Areas Being Considered for Renovation?
The proposed renovations are part of a larger project to address aging facilities and improve the high school’s learning environment.
One goal of the proposed design is to discourage students from gathering in restroom areas during instructional time and engaging in inappropriate behavior.
The district is exploring a layout that would provide greater privacy within individual toilet rooms while making shared areas easier for staff to supervise.
How Would Student Privacy Be Protected?
The current design concept includes enclosed, private toilet rooms with floor-to-ceiling walls and doors. Features intended to limit sound between them are also being considered
This approach is intended to provide greater privacy than traditional restroom stalls and can accommodate students with a variety of individual needs.
The district does not plan to install security cameras inside the private toilet rooms.
Specific design details will continue to be evaluated as the project moves forward.
How Would the Renovations Address Student Safety?
The proposed design is intended to make shared sink areas easier for staff to see and supervise, helping to discourage inappropriate activities.
Also under consideration are vape detection technology and fire alarm devices within each toilet room. Security cameras are proposed for shared sink areas and entrance and exit areas outside the private toilet rooms.
No security cameras are planned for inside the private toilet rooms.
These safety and supervision features remain subject to further review and refinement during the design development process.
Would Students Share Toilet Rooms?
No. Under the current proposal, each toilet room would be fully enclosed and intended for use by one student at a time
Students would be able to use the proposed shared sink area at the same time, while individual toilet rooms would remain private. The proposed facilities would be available for student use, regardless of gender. This approach is intended to provide a welcoming restroom option for all students while maintaining individual privacy.
These arrangements reflect the current schematic design and may be refined as planning continues.
Would Traditional Bathrooms Still Be Available?
Yes. Under the current renovation plans, some existing restrooms with traditional layouts would remain available at Strath Haven High School and would not be modified as part of the project.
The district will continue to evaluate restroom configurations as the design process progresses.How Was the Design Developed and Approved?
District administrators and staff worked with KCBA Architects, the architectural firm supporting the project, to develop preliminary plans that consider student privacy, safety, and supervision.
The proposed renovations were included in the schematic design presentation shared publicly on September 15, 2026.
The Wallingford-Swarthmore Board of School Directors approved the schematic design on September 28, 2026, allowing the project to move into the next phase of design development.
Approval of the schematic design does not mean that every proposed feature or layout has been finalized. The schematic design establishes the general direction of the project, while the design development phase allows for further evaluation and refinement of specific details.
How Much Will the Renovations Cost?
The Board of School Directors has approved a total project budget of up to $70 million for the Strath Haven High School renovations. The project includes significant investments in the building's infrastructure, along with other facility improvements.
The September 15 schematic design presentation included a preliminary estimate of approximately $76 million for the overall project, exceeding the approved budget. Project costs and design options will continue to be reviewed further as planning continues.
The proposed universal individual toilet rooms represent one component of the larger renovation project. A separate cost for these improvements was not identified in the schematic design presentation.
As the design is refined, the scope and costs of individual project components may also change.
Where Can I Find More Information?
The Strath Haven High School schematic design presentation includes information about the proposed renovations, including preliminary floor plans, toilet room concepts, and project cost estimates.
Additional project information is available on the district’s Capital Plan Informational Files webpage.
The district will continue to share information as the project moves through design development and additional details become available.